New pavement on the runway
Type of project
New Paving on an Existing Runway
Track Type
Porous concrete
Location
The Eastern Valleys
Antiquity
About 40 years
Description
Private court for regular use
Features
Because they are old, the brake pads are slightly uneven, with a few cracks and currently no drainage
The project consisted of
A thorough cleanup of the site, leveling of the damage, installation of new net posts, extensive drainage at the base, and subsequent installation of REINGREEN pavement